Project Details
Major issue that had to be solved:
Ensure safety and aesthetics of working stores during the addition of 1.3 million square foot expansion. A portion of the shopping center was open during the remodel, which meant our team was responsible for ensuring a safe environment for the shoppers, redirecting them around closed areas while hauling in thousands of square feet of materials.
Internal or External construction:
Internal & External
The period from engagement to completion:
We engaged with Westfield 9 months prior to the project launch. We visited the site multiple times to work through and confirm the scope of work for the barricades and graphics. Our account team and design team worked with the tenants to secure their creative art files, create mockups and share them with Westfield for approval. As additional tenants came on board, we quickly responded and secured artwork for print production. The installation of barricades and graphics took place over a 2 week period in tight collaboration with the general contractors, and tenant coordination.
Number of elements installed:
62 barricades, 2,900 linear foot of modular barricade panels with 40,000 square feet of graphics.
Materials/Products used:
Modular Barricade Panels, Large format vinyl graphics, and Mesh Banner Material
Results:
On-time completion of tenant graphics, development graphics, additional decor elements to enhance the newly opened wing.
Services used:
Graphic design, Site Coordination, Engineering Solutions, Barricade & Graphic Installation
Our team is ready to start your barricade project.
Contact us for solutions that are On Brand. On Time.